HOW A SAMPLE GETS APPROVED

Seven business days between the approved logo and the physical garment on the table. What happens in each one.

Técnica de taller revisando una muestra de tela con instrumental de laboratorio

A sample starts once the client approves the logo and the tech pack: composition, weight and color. From that point, the workshop commits to seven business days until the physical garment is on the table. That's not an optimistic sales estimate — it's the deadline that cutting, sewing and finishing commit to under the same roof in Lima.

The first days are lab work: checking that the fabric that arrived matches the approved spec, checking the color shade against the client's Pantone, and testing the finish — breathable, repellent, antibacterial, or whatever the line calls for — before cutting a single centimeter. Cutting into unverified fabric is the mistake that makes most samples get redone.

After that comes the same process that runs in production, just at the scale of a single garment: cutting, sewing and quality control before packing. The sample isn't a simplified version of the final product — it's the final product at minimum quantity, so the client approves exactly what they'll receive in the full batch.

Once the sample is approved, the order moves to production: fifteen business days and thirty units minimum per model. The sample's timeline isn't subtracted from production's — it's added on top. That's the price of not improvising on a batch of hundreds of garments.

Next step

LET'S TALK ABOUT YOUR ORDER

If anything you read here applies to what you need to produce, let's set up a sample.

MOQ 30 UNITS · SAMPLE 7 DAYS · PRODUCTION 15 DAYS